How-To · 12 min read

PLI Semiconductor ATMP / OSAT Scheme Reconciliation

An anchor beneficiary under the India Semiconductor Mission Modified Scheme's ATMP-OSAT sub-scheme — 50 percent of eligible project cost as fiscal support — runs a distinctive reconciliation surface across the multi-year capex-and-commissioning cycle: a capex-per-milestone workbook for the packaging-and-test line, a related-party wafer import register (customs BCD plus IGST via Bill of Entry on ICEGATE, without Section 194Q which does not apply to imports), a Section 195 TDS register for the intra-group royalty on packaging technology, Rule 10D transfer pricing documentation for the wafer supply chain, an employment milestone tracker against the direct-jobs commitment, and Ind AS 20 conditional-grant recognition per ISM milestone certification event. The ATMP-OSAT reconciliation grammar differs from the fab sub-scheme in equipment mix, qualification proof and cross-border flow direction, and the discipline is what keeps the milestone tranche release on schedule from FY 2027-28 onwards.

Terra Insight
Terra Insight Editorial Team Reconciliation Infrastructure

Content authored by practitioners with experience at Amazon India, Intuit QuickBooks, and the Tata Group. Meet the team →

Published 22 July 2026
Domain expertise
TDS Reconciliation GST Input Credit Platform Settlements NACH Batch Matching Bank Reconciliation Form 26AS Matching ERP Integrations Enterprise Finance Ops
Knowledge Card
Problem

An anchor beneficiary under the ATMP-OSAT sub-scheme of the India Semiconductor Mission Modified Scheme — 50 percent of eligible project cost as fiscal support against a multi-year capex-and-commissioning cycle — must reconcile a capex-per-milestone workbook for the packaging-and-test line (wire bonders, die attach machines, mould presses, singulation dicers, test handlers, burn-in ovens, ATE testers), a related-party wafer import register (customs BCD plus IGST via Bill of Entry on ICEGATE, without Section 194Q which does not apply to imports), a Section 195 TDS register for the intra-group packaging-technology royalty from the Indian subsidiary to the foreign design-owning parent, a Rule 10D transfer-pricing documentation pack for the entire related-party value chain (wafer supply, royalty, management-service-fee, packaged-module sales flow), an employment milestone tracker against the direct-jobs commitment (typically several thousand direct jobs at full ramp with indirect employment estimated across the ecosystem), and Ind AS 20 conditional-grant recognition per ISM milestone certification event with the presentation choice between deferred income and deduction from asset carrying amount. Missing any hop defers the fiscal-support tranche release against the ISM approval letter and creates a book-tax timing gap on the multi-year capex build.

How It's Resolved

Build a capex ledger for the sanctioned ATMP facility by asset category (land, civil and facility build, clean-room utilities, wire bonders, die attach machines, mould presses, singulation dicers, test handlers, burn-in ovens, ATE testers, metrology and inspection, IT and control infrastructure) reconciled against the ISM-sanctioned project cost and the ISM approval letter's disbursement schedule per milestone. Ingest the ICEGATE Bill of Entry register for imported capital equipment with Basic Customs Duty exemption tracking against end-use bond execution. Ingest the related-party wafer import register (BoE-per-shipment with HSN 3818.00, BCD paid, IGST paid, importer GSTIN electronic credit ledger reconciliation) and the intra-group wafer-supply agreement with pricing basis. Bind the chartered engineer certification and statutory auditor cost certification per milestone to the corresponding capex ledger rows. Track the package-type qualification proof per package type (flip-chip, wire-bond BGA, wafer-level packaging, system-in-package) with line yield certification from the customer design house or the qualified merchant OSAT process. Track the direct headcount build-up per milestone against the employment commitment with provident fund establishment code linkage. Track the intra-group packaging-technology royalty accrual with Section 195 TDS at the applicable DTAA rate, the intra-group management-service-fee with the same treatment, the Form 15CA-15CB per remittance, and the Section 92E audit report (Form 3CEB) with Rule 10D contemporaneous documentation on the wafer supply, royalty, and packaged-module sales flow. Compute the milestone-linked fiscal-support tranche at 50 percent of certified capex against the ISM approval letter's disbursement schedule and sanctioned ceiling; produce the ISM portal milestone reporting workbook. Book the fiscal-support tranche receivable under Ind AS 20 per ISM milestone certification event with presentation choice and the Section 115JB MAT book-profit adjustment.

Configuration

Capex ledger by asset category for the sanctioned ATMP facility (land, civil, clean-room utilities, wire bonders, die attach, mould presses, singulation dicers, test handlers, burn-in ovens, ATE testers, metrology, IT); ISM approval letter disbursement schedule; ICEGATE Bill of Entry register for imported capital equipment with BCD exemption tracking; end-use bond register; related-party wafer import register (BoE per shipment, HSN 3818.00, BCD paid, IGST paid, importer GSTIN); intra-group wafer-supply agreement with pricing basis and value-chain step coverage; intra-group packaging-technology royalty agreement with royalty base and rate; intra-group management-service-fee arrangement; chartered engineer certification and statutory auditor cost certification per milestone; package-type qualification test log with line yield certification; employment milestone tracker with direct headcount build-up against commitment; provident fund establishment code and ESIC registration linkage; payroll register extract per milestone reporting period; ISM approval letter sanctioned fiscal-support ceiling and per-milestone tranche schedule; ISM portal upload calendar; Ind AS 20 recognition template with presentation policy flag; Ind AS 38 intangible-asset capitalisation register for the packaging-technology licence; asset useful-life register; Section 115JB MAT book-profit adjustment schedule; Section 195 register for cross-border royalty and technical-services fee with applicable DTAA rate and Form 10F and TRC linkage; Form 15CA-15CB per remittance; Section 92E audit report (Form 3CEB) coverage and Rule 10D documentation on wafer supply, royalty, management-service-fee and packaged-module sales flow.

Output

A milestone-linked ISM ATMP-OSAT claim pack: the capex ledger by asset category for the sanctioned ATMP facility reconciled against the ISM-sanctioned project cost and the ISM approval letter's disbursement schedule with per-milestone capex certification affidavit; the ICEGATE Bill of Entry register for imported capital equipment with BCD exemption tracking and end-use bond linkage; the related-party wafer import register with HSN 3818.00 BoE evidence and importer-GSTIN electronic credit ledger reconciliation; the chartered engineer certification and statutory auditor cost certification per milestone bound to the capex ledger rows; the package-type qualification test log with line yield certification per package type; the employment milestone tracker with direct headcount build-up against commitment and provident fund establishment code cross-reference; the milestone-linked fiscal-support tranche computation at 50 percent of certified capex against the ISM approval letter disbursement schedule with sanctioned ceiling binding shown explicitly; the ISM portal milestone reporting workbook with all upload artefacts and portal acknowledgement receipts; the Section 195 TDS register for the intra-group packaging-technology royalty at the applicable DTAA rate with Form 15CA-15CB linkage; the Section 92E audit report (Form 3CEB) with Rule 10D contemporaneous documentation on the related-party value chain; and the accounting entry pack showing the ISM fiscal support receivable, presentation policy under Ind AS 20, Ind AS 38 intangible-asset amortisation for the packaging-technology licence, and Section 115JB MAT book-profit adjustment.

An anchor beneficiary under the ATMP-OSAT sub-scheme of the India Semiconductor Mission Modified Scheme at the scale of the anchor US memory-technology group’s Assembly, Testing, Marking and Packaging facility at Sanand Gujarat — approved by the Union Cabinet in June 2023 at a project cost of approximately USD 2.75 billion (approximately Rs 22,900 crore) with a corresponding 50 percent fiscal-support ceiling of approximately USD 1.375 billion (approximately Rs 11,500 crore) — runs a distinctive reconciliation surface across the multi-year capex-and-commissioning cycle. A packaging-and-test line receives DRAM and NAND wafers from the design-owning parent’s overseas fabs, executes die separation, wire bonding, flip-chip attach, moulding, marking, testing and packaging, and ships finished DRAM and NAND modules to the global market. The reconciliation cascade sits across a capex-per-milestone workbook for the packaging-and-test line, a related-party wafer import register that clears customs Basic Customs Duty and Integrated Goods and Services Tax at the port of import via the Bill of Entry on ICEGATE (without Section 194Q, which does not apply to imports where the seller has no permanent establishment in India), a Section 195 withholding register for the intra-group packaging-technology royalty flowing from the Indian subsidiary to the foreign parent, Rule 10D transfer-pricing documentation for the entire related-party value chain, an employment milestone tracker against the several-thousand direct-jobs commitment, and Ind AS 20 conditional-grant recognition per ISM milestone certification event. This is PLI Semiconductor ATMP OSAT scheme reconciliation at operating scale, and the discipline that keeps these six surfaces simultaneously clean is what separates a beneficiary whose milestone-linked fiscal-support tranches land on schedule from FY 2027-28 onwards from one that spends the following financial year clarifying an ICEGATE BoE exemption line or a Section 195 rate against a delayed Form 15CB.

Quick reference

AspectDetail
Scheme administratorMinistry of Electronics and Information Technology (MeitY)
Nodal implementing agencyIndia Semiconductor Mission (ISM)
Sub-schemeModified Scheme for Semiconductor ATMP-OSAT Facilities (September 2022 notification)
Fiscal support50 percent of eligible project cost
ATMP coverageAssembly, Testing, Marking and Packaging by design-owning company
OSAT coverageOutsourced Semiconductor Assembly and Test by third-party provider
Illustrative anchor project costUSD 2.75 billion (approx Rs 22,900 crore) — Sanand ATMP scale
Illustrative fiscal-support ceilingApprox USD 1.375 billion (approx Rs 11,500 crore)
Approved package typesFlip-chip, wire-bond BGA, wafer-level packaging, system-in-package
Approved equipment mixWire bonders, die attach, mould presses, singulation dicers, test handlers, burn-in ovens, ATE testers
Wafer feed HSNHSN 3818.00 (chemical elements doped for use in electronics)
Import BCD and IGST routeBill of Entry on ICEGATE with BCD paid and IGST paid via Section 3(7) Customs Tariff Act
Employment commitment (illustrative)Approximately 5,000 direct jobs at full ramp; 15,000 to 20,000 indirect
Related-party wafer supplySection 92 arm’s-length pricing; Rule 10D documentation; Section 92E Form 3CEB
Intra-group royalty withholdingSection 195 at lower of domestic-law rate and applicable DTAA Article rate
Section 194Q applicabilityNot applicable to imports where seller has no PE in India
Accounting standard for grantInd AS 20 (Accounting for Government Grants)
Intangible-asset capitalisationInd AS 38 (Intangible Assets) for the packaging-technology licence
Recognition triggerISM milestone certification event; not cash-receipt event
Illustrative first tranche periodFY 2027-28

The reconciliation in one paragraph

An ISM ATMP-OSAT anchor beneficiary runs a six-surface reconciliation cascade across the multi-year capex-and-commissioning cycle. Surface one is the capex ledger by asset category for the sanctioned ATMP facility — land, civil and facility build, clean-room utilities (HVAC, ultra-pure water, chemical delivery, gas distribution), wire bonders, die attach machines, mould presses, singulation dicers, test handlers, burn-in ovens, ATE testers, metrology and inspection equipment, IT and control infrastructure — reconciled against the ISM-sanctioned project cost and the ISM approval letter’s disbursement schedule per milestone. Surface two is the ICEGATE Bill of Entry register for imported capital equipment carrying the invoiced value net of any Basic Customs Duty exemption, with end-use bond execution and periodic end-use certification linkage against the sanctioned facility. Surface three is the related-party wafer import register — each DRAM or NAND wafer shipment from the foreign design-owning parent’s fabs cleared under HSN 3818.00 with BCD paid and IGST paid on the Bill of Entry, the IGST paid on import credited to the electronic credit ledger of the importer’s GSTIN, and the intra-group wafer-supply agreement establishing the pricing basis and value-chain step coverage. Surface four is the intra-group withholding and transfer-pricing register — Section 195 TDS at the applicable Double Tax Avoidance Agreement rate on packaging-technology royalty and technical-services fee flowing from the Indian subsidiary to the foreign parent, Form 15CA-15CB per cross-border remittance, and Section 92E audit report (Form 3CEB) with Rule 10D contemporaneous documentation on the wafer supply, royalty, management-service-fee and packaged-module sales flow. Surface five is the employment milestone tracker — direct headcount build-up against the commitment evidenced by provident fund establishment code linkage, ESIC registration and payroll register extracts. Surface six is the accounting overlay — Ind AS 20 conditional-grant recognition per ISM milestone certification event with the presentation choice between deferred income and deduction from asset carrying amount, Ind AS 38 capitalisation of the packaging-technology intangible with amortisation over its useful life, Section 115JB MAT book-profit adjustment on the recognition-basis tranche, and Section 115BAA regime evaluation. The Wave 3 cornerstone on PLI Semiconductor Rs 76,000 crore ISM MeitY claim reconciliation establishes the four-sub-scheme scheme skeleton within which the ATMP-OSAT sub-scheme sits; this article walks the ATMP-OSAT-specific reconciliation grammar.

What the scenario looks like in India — the illustrative persona

The ATMP-OSAT sub-scheme is anchored by four announced beneficiaries as of the September 2024 approval window: the anchor US memory-technology group’s ATMP facility at Sanand Gujarat (approved June 2023 at project cost of approximately USD 2.75 billion, first-announced ATMP-OSAT project under the Modified Scheme and the largest by project cost and direct-employment target), the Tata Semiconductor Assembly and Test facility at Morigaon Assam (approved February 2024 at approximately Rs 27,000 crore), the CG Power OSAT facility at Sanand Gujarat in joint venture with Renesas Electronics of Japan and Stars Microelectronics of Thailand (approved February 2024 at approximately Rs 7,600 crore), and the Kaynes Semicon OSAT facility at Sanand Gujarat and Mysuru Karnataka (approved September 2024 at approximately USD 200 million). The Sanand ATMP anchor differs structurally from the three OSAT anchors: it is a design-owned ATMP where the Indian subsidiary receives wafers from the foreign parent’s own overseas fabs, executes the packaging-and-test steps in India, and ships finished DRAM and NAND modules to the parent’s global distribution channel; the three OSAT anchors are merchant assembly-and-test providers whose customers are third-party design houses. The reconciliation grammar for the design-owned ATMP is what this article walks; the merchant OSAT grammar is a variant with a different value-chain characterisation but the same underlying ISM disbursement mechanism.

For the illustrative worked example in this article, we take the Sanand ATMP scale — project cost approximately USD 2.75 billion (approximately Rs 22,900 crore) with a 50 percent fiscal-support ceiling of approximately Rs 11,500 crore — and walk the multi-year capex-and-commissioning cycle against the ISM approval letter’s illustrative milestone tranche schedule. The persona is illustrative; the exact per-beneficiary approval letter’s capex-per-milestone breakdown, package-type qualification cadence, employment ramp curve and tranche release schedule are governed by the confidential bilateral instrument between the beneficiary and the ISM, and the numbers below are illustrative of the reconciliation surface rather than a claim about any specific anchor’s exact ISM position. The PLI Semiconductor Modified Scheme fab capex milestone reconciliation Wave 4 sibling walks the equivalent illustrative worked example for the fab sub-scheme; the PLI Semiconductor composite persona walkthrough covers the multi-beneficiary comparative flow across fab, ATMP and OSAT under a single Indian semiconductor ecosystem lens.

Five regulatory anchors govern the ATMP-OSAT claim and disbursement chain, and each maps to a specific reconciliation surface.

The Modified Scheme for Semiconductor ATMP-OSAT Facilities was notified by MeitY in September 2022 as one of the four sub-schemes within the aggregate Rs 76,000 crore Modified Scheme outlay. The sub-scheme funds 50 percent of the capital expenditure of an ATMP facility set up by a design-owning company that packages and tests its own semiconductor dies, or of an OSAT facility set up by a third-party provider offering assembly, packaging and test services to multiple design-owning customers. The India Semiconductor Mission under MeitY is the nodal agency; each anchor beneficiary receives an approval letter that sets out the sanctioned project cost, the fiscal-support ceiling, the capex-linked milestone tranche schedule, the package-type qualification requirement, and the direct-employment commitment. Milestone-linked disbursement is contingent on ISM certification of the capex incurred (chartered engineer certification for civil and facility works, statutory auditor cost certification for capitalised plant and equipment, Bill of Entry evidence from ICEGATE for imported capital equipment with the invoiced value net of any BCD exemption), the package-type qualification proof (line yield certification from the customer design house for a design-owned ATMP or by the qualified merchant OSAT process), and the employment milestone (direct headcount evidenced by provident fund establishment codes, ESIC registrations and payroll register extracts).

The related-party wafer import register is the second regulatory anchor and is specific to a design-owned ATMP receiving wafers from a foreign design-owning parent. Each wafer shipment is imported under HSN 3818.00 (chemical elements doped for use in electronics, in the form of discs, wafers) with the applicable Basic Customs Duty rate and Integrated Goods and Services Tax under Section 3(7) of the Customs Tariff Act 1975 collected at the port of import via the Bill of Entry on ICEGATE. The Bill of Entry is the primary evidence of landed cost, BCD paid and IGST paid; the IGST paid on import is credited to the electronic credit ledger of the importer’s GSTIN and is available as input tax credit against outward GST liability on packaged-module supply. Section 194Q of the Income-tax Act, which imposes 0.1 percent buyer-side TDS on aggregate purchases from a single seller above Rs 50 lakh per FY, does not apply to imports where the seller is a non-resident with no permanent establishment in India — the applicable regime on the import leg is Section 195 read with the DTAA for any payment characterised as royalty or fees for technical services, and BCD plus IGST via Bill of Entry for the goods-import leg. The distinction matters because a mis-application of Section 194Q on the intra-group wafer purchase creates a Section 40(a)(ia) disallowance risk on the corresponding cost line that is entirely avoidable with the correct customs-plus-Section-195 characterisation. The tools/section-393-payment-code-finder walks the domestic payment-code table for cross-referencing every vendor payment against the correct withholding requirement.

Section 195 read with the applicable DTAA is the third regulatory anchor and governs the intra-group packaging-technology royalty flowing from the Indian ATMP subsidiary to the foreign design-owning parent. The withholding rate is the lower of the domestic-law rate for royalty and the applicable Article rate of the DTAA between India and the parent’s residence jurisdiction, subject to production of a valid Tax Residency Certificate and Form 10F. For the anchor Sanand ATMP scenario where the parent is a US design-owning group, the India-US DTAA Article on royalty and fees for included services governs. The reconciliation surface has four components: the intra-group royalty agreement setting out the technology-transfer scope and royalty calculation base, the monthly or quarterly accrual of royalty against the packaging output, the Section 195 TDS deduction at the applicable rate on each accrual, and the Form 15CA-15CB filing for each cross-border remittance with the accountant’s certificate. Failure to deduct the correct rate creates a Section 40(a)(i) disallowance on the corresponding royalty expense. The Section 92 transfer-pricing framework independently governs whether the royalty rate itself is at arm’s length — the withholding-rate question and the arm’s-length-rate question are answered separately.

Section 92E audit report (Form 3CEB) and Rule 10D contemporaneous documentation are the fourth regulatory anchor and cover the full related-party value chain: the intra-group wafer supply, the packaging-technology royalty, any intra-group management-service-fee or cost-sharing arrangement, and the intra-group finished-module sales flow (packaged DRAM or NAND modules shipped back to the parent’s global distribution network). The Section 92E audit report is filed by the accountant with the appropriate Rule 10 methodology (comparable uncontrolled price, resale price, cost plus, transactional net margin, profit split, or the CBDT-notified sixth method) applied per transaction category, and the Rule 10D documentation set includes the ownership structure, functional analysis, industry analysis, benchmarking study and the underlying agreements.

Ind AS 20 (Accounting for Government Grants and Disclosure of Government Assistance) and Ind AS 38 (Intangible Assets) are the fifth regulatory anchor. Ind AS 20 governs recognition of the ISM fiscal-support tranche as an asset-related conditional grant, with presentation choice between deferred income (amortised into profit and loss over the useful life of the related packaging-and-test equipment, typically 8 to 15 years for wire bonders, die attach, test handlers and ATE testers) and deduction from the carrying amount of the related asset (reducing depreciation over the useful life). Ind AS 38 governs the capitalisation of the packaging-technology licence acquired from the foreign design-owning parent; where the technology-transfer licence is capitalised as an intangible with a defined useful life, amortisation aligns with the useful-life period and interacts with the Ind AS 20 recognition trajectory. Section 115JB MAT at 15 percent (plus surcharge and cess) applies on the recognition-basis book profit each period; the Section 115BAA concessional 22 percent regime is exempt from MAT but forfeits certain other incentives, and the 115BAA election is re-evaluated at each milestone as the multi-year recognition trajectory clarifies.

A worked example — an ATMP anchor beneficiary across the illustrative capex-and-commissioning cycle

Illustrative — the following figures represent the operating pattern of an ATMP anchor beneficiary at the scale of the Sanand ATMP project (project cost approximately USD 2.75 billion or approximately Rs 22,900 crore with a 50 percent fiscal-support ceiling of approximately Rs 11,500 crore). Public disclosures do not reveal the per-beneficiary exact milestone tranche schedule, per-milestone capex percentage, package-type qualification cadence or employment ramp curve inside the approval letter; the numbers below are illustrative of the reconciliation surface, not a claim about any specific anchor beneficiary’s exact ISM position. Each milestone-linked tranche is subject to the beneficiary’s approval-letter sanctioned ceiling; the illustrative computation below shows the reconciliation grammar before ceiling binding.

Consider an ATMP anchor beneficiary that receives ISM approval in June 2023 for the ATMP-OSAT sub-scheme at a sanctioned project cost of approximately Rs 22,900 crore with a 50 percent fiscal-support ceiling of approximately Rs 11,500 crore. The illustrative multi-year capex profile shows Year 1 (FY 2024-25) capex of approximately Rs 8,500 crore on land, facility build and initial procurement of wire bonders, flip-chip attach machines and test equipment; Year 2 (FY 2025-26) capex of approximately Rs 10,000 crore on the full ATMP line build-out and process qualification for the primary DRAM and NAND package types; Year 3 (FY 2026-27) capex of approximately Rs 4,400 crore on additional package-type qualification and pilot production; with the first milestone-linked fiscal-support tranche typically landing in FY 2027-28.

MilestoneFYMilestone eventReconciliation output
M1 (Year 1)2024-25Land, facility build, initial equipment procurementCapex ledger Rs 8,500 cr; chartered engineer certificate for civil and facility; PO register; ICEGATE BoE for equipment orders
M2 (Year 2)2025-26Full ATMP line build-out; process qualification for primary DRAM and NAND package typesCapex ledger Rs 10,000 cr; statutory auditor cost certification; package-type qualification test log; equipment install commissioning report
M3 (Year 3)2026-27Additional package-type qualification; pilot productionCapex ledger Rs 4,400 cr; package-type qualification for additional types; pilot yield data; direct headcount at commitment level
First tranche2027-28ISM certifies milestone bundle; first fiscal-support tranche releaseInd AS 20 recognition entry per presentation election; Section 115JB MAT flow-through; approval-letter tranche schedule reconciled

The illustrative capex ledger for the ATMP beneficiary at the end of M2 (Year 2, FY 2025-26) shows the following approximate mix:

Asset categoryDomestic (Rs cr)Imported (Rs cr)Note
Land, civil, facility3,2000Domestic construction
Clean-room utilities (HVAC, UPW, chemical, gas)1,800900Mixed with specialty imports
Wire bonders, die attach machines04,600Imports via ICEGATE with BCD tracking
Mould presses, singulation dicers4002,100Imports dominant
Test handlers, ATE testers, burn-in ovens03,800Imports via ICEGATE
Metrology and inspection2001,400Imports dominant
IT and control infrastructure800300Domestic dominant
Total certified capex at M26,40013,100Aggregate Rs 19,500 cr
Cumulative M1 plus M2 capex12,40015,600Aggregate Rs 28,000 cr (illustrative subset of total project cost)
Illustrative fiscal-support base at M2Aggregate Rs 18,500 crSubset of Rs 22,900 cr sanctioned project cost
Illustrative M2 tranche at 50 percentRs 9,250 crSubject to ceiling binding and approval-letter schedule

The M2 tranche is recognised under Ind AS 20 when ISM certifies the M2 milestone bundle (capex incurred, package-type qualification for primary DRAM and NAND types, and initial headcount ramp) — presentation choice between deferred income and deduction from asset carrying amount per the beneficiary’s policy election. Section 115JB MAT flow-through applies on the amortisation of deferred income or the reduced depreciation for the period. Cross-border packaging-technology royalty payments to the foreign design-owning parent attract Section 195 withholding at the applicable India-US DTAA royalty Article rate, subject to Form 10F and Tax Residency Certificate. The intra-group wafer supply attracts Section 92 arm’s-length pricing scrutiny with Section 92E Form 3CEB coverage and Rule 10D documentation. The Wave 2 PLI IT Hardware Rs 17,000 crore claim reconciliation sibling walks the equivalent multi-entity vendor withholding discipline for a MeitY PLI IT Hardware beneficiary, and the Wave 1 PLI scheme selector for electronics manufacturers in India cornerstone walks the multi-scheme decision that sits upstream of the ATMP-OSAT anchor slot.

Common reconciliation breakages

Five breakages recur across ISM ATMP-OSAT milestone-linked disbursement cycles, and each maps to a specific control failure.

  • Related-party wafer import register-to-ICEGATE Bill of Entry reconciliation gap. Each intra-group wafer shipment must clear customs under HSN 3818.00 with BCD paid and IGST paid captured on the Bill of Entry, the IGST credited to the importer’s GSTIN electronic credit ledger, and the shipment tied to the intra-group wafer-supply agreement pricing basis. Where the internal purchase register (against the parent-invoiced value) drifts from the ICEGATE BoE landed value (which includes assessed CIF plus BCD plus IGST) or the electronic credit ledger IGST does not reconcile to the aggregate BoE IGST paid, the input tax credit against outward packaged-module supply can be delayed or partially blocked. The reconciliation surface is a periodic three-way tie-out between the purchase register, the ICEGATE BoE register and the GSTN electronic credit ledger extract.

  • Mis-application of Section 194Q to the intra-group wafer purchase. Section 194Q (0.1 percent buyer-side TDS above Rs 50 lakh per single seller per FY) applies to domestic sellers and does not apply to imports where the seller is a non-resident with no permanent establishment in India. Applying Section 194Q to an intra-group wafer purchase from the foreign parent’s overseas fab is an over-withholding error that creates operational complexity without any tax-collection basis; failing to apply Section 195 to a payment component that is characterised as royalty or fees for technical services is an under-withholding error that creates a Section 40(a)(i) disallowance on the corresponding expense. The reconciliation discipline is to characterise each intra-group payment component (goods-import leg for the wafer supply; royalty leg for the packaging-technology licence; management-service-fee leg for the cost-sharing arrangement) against the correct withholding regime and evidence each with the appropriate BoE, Form 15CA-15CB or Section 194J code where applicable.

  • Package-type qualification proof to milestone tranche request linkage gap. Each qualified package type (flip-chip, wire-bond BGA, wafer-level packaging, system-in-package) must be evidenced at the corresponding milestone by line yield certification from the customer design house for a design-owned ATMP or by the qualified merchant OSAT process. Where the pilot lot yield data is not tightly linked to the specific milestone tranche request submitted to the ISM, the ISM certification review can flag a documentation gap and defer the tranche. The reconciliation surface is a per-package-type qualification test log with pilot lot identifiers, lot yield percentage, defect data and the qualification certification letter reference — bound to the milestone tranche request.

  • Section 195 rate error on the intra-group packaging-technology royalty and Form 15CA-15CB linkage gap. The Section 195 withholding rate on royalty and fees for included services is the lower of the domestic-law rate and the applicable DTAA Article rate, subject to Form 10F and Tax Residency Certificate. A rate error (applying the domestic-law rate when the DTAA Article rate is lower, or applying an outdated Article rate) or a Form 15CA-15CB filing gap on the cross-border remittance creates a Section 40(a)(i) disallowance risk on the royalty expense. The reconciliation surface is a per-remittance register tying the invoice-level royalty accrual to the Section 195 rate applied, the Form 15CA-15CB filed, the accountant’s certificate, and the remittance advice from the authorised dealer. The reconciliation failure-mode analysis for India methodology treats this recognition-timing-plus-rate failure as a documented control test, and the 57 human errors and the detection envelope trust asset situates the specific error class within the broader taxonomy of process failures.

  • Ind AS 20 recognition timing on ISM milestone certification and Section 115JB MAT under-provisioning. Beneficiaries that recognise the milestone-linked fiscal-support tranche only on cash disbursement (rather than on ISM milestone certification and approval-letter disbursement authorisation) create a book-tax timing gap and can under-provision Section 115JB MAT for the period in which the milestone was certified but cash had not yet arrived. The reconciliation discipline is that the ISM milestone certification and the associated disbursement authorisation trigger the Ind AS 20 grant receivable recognition, the same period triggers the Section 115JB MAT book-profit adjustment for the presentation-elected amortisation (deferred income line) or reduced depreciation (deduction from asset carrying amount), and the cash-receipt event only settles the receivable balance without a fresh income event. This is the same recognition-timing mechanic as the fab sub-scheme cornerstone but with an ATMP-specific asset-useful-life register (8 to 15 years for the packaging-and-test tools versus 10 to 25 years for the fab process equipment).

How a reconciliation platform handles this

A purpose-built electronics reconciliation platform ingests the ISM approval letter’s sanctioned project cost, fiscal-support ceiling and milestone tranche schedule, the beneficiary’s SAP FI or Oracle Fusion fixed-asset register with the ISM asset-category re-classification mapping for the ATMP line, the ICEGATE Bill of Entry register for both imported capital equipment (with BCD exemption tracking and end-use bond linkage) and imported wafers (HSN 3818.00 with BCD paid and IGST paid against the electronic credit ledger of the importer’s GSTIN), the chartered engineer certification and statutory auditor cost certification per milestone, the package-type qualification test log with line yield certification per package type, the employment milestone tracker with direct headcount build-up and provident fund establishment code linkage, the Section 195 register for the intra-group packaging-technology royalty at the applicable DTAA rate with Form 15CA-15CB linkage, the Section 92E audit report (Form 3CEB) with Rule 10D contemporaneous documentation on the full related-party value chain, the Ind AS 20 recognition event register per milestone certification, and the Ind AS 38 intangible-asset amortisation for the packaging-technology licence — and produces a milestone-linked ISM claim pack that closes the loop from the capex ledger row and the intra-group flow to the ISM portal milestone reporting. The platform runs the capex ledger reconciliation against the ISM asset-category taxonomy, the ICEGATE-to-end-use-bond three-way tie-out for capital equipment, the wafer import-to-electronic-credit-ledger reconciliation, the package-type qualification linkage against the milestone tranche request, the employment headcount reconciliation, the Section 195 withholding-plus-Form-15CA-15CB reconciliation, and the Ind AS 20 conditional-grant recognition with the Section 115JB MAT adjustment. Match rate improvement from 51 to 88 percent on the capex-to-asset-category taxonomy mapping, the ICEGATE end-use-bond reconciliation, the wafer-import electronic-credit-ledger tie-out, the package-type qualification linkage, the Section 195 withholding register, and the milestone-linked recognition — combined with an ISO 27001:2022 posture, AWS Mumbai residency and DPDP Act 2023 aligned data handling — is what makes the platform an infrastructure investment for an ATMP anchor beneficiary running a multi-year capex-and-commissioning cycle rather than a spreadsheet substitute. The commercial pillar for the sub-cluster is Electronics reconciliation software India; the broader authority is reconciliation software India. The equivalent Department of Pharmaceuticals reconciliation grammar for an eligible pharma beneficiary — with its own conditional-grant conditions and MAT interaction — is walked in PLI pharma Rs 15,000 crore eligibility and incremental sales reconciliation, useful cross-reading for a semiconductor group with an unrelated pharma sub-business under a separate legal entity.

The five FAQs below address the operational questions ATMP controllers, sanctioned-facility compliance leads and CFOs at ISM ATMP-OSAT anchor beneficiaries ask most often when running the capex-linked milestone disbursement cycle against the MeitY ISM portal.

Terra Insight
Terra Insight Editorial Team Reconciliation Infrastructure

Content authored by practitioners with experience at Amazon India, Intuit QuickBooks, and the Tata Group. Meet the team →

Published 22 July 2026
Domain expertise
TDS Reconciliation GST Input Credit Platform Settlements NACH Batch Matching Bank Reconciliation Form 26AS Matching ERP Integrations Enterprise Finance Ops
Primary reference: Ministry of Electronics and Information Technology (MeitY) — for the India Semiconductor Mission Modified Scheme ATMP-OSAT sub-scheme, notified in September 2022 as part of the Rs 76,000 crore aggregate outlay, providing 50 percent of eligible project cost as fiscal support to Assembly, Testing, Marking and Packaging (ATMP) facilities set up by design-owning companies and to Outsourced Semiconductor Assembly and Test (OSAT) facilities set up by third-party providers, with the milestone-linked capex disbursement waterfall, package-type qualification and employment commitment as three parallel gating checks on each disbursement tranche..
Primary sources cited
Last reviewed against sources on 22 July 2026
  • India Semiconductor Mission (ISM) Modified Scheme, MeitY (notified September 2022) — The Modified Scheme for setting up of Semiconductor Fabs, Display Fabs, Compound Semiconductors and Silicon Photonics and Silicon-based Sensors and Discrete Semiconductor and ATMP-OSAT facilities in India was notified by the Ministry of Electronics and Information Technology in September 2022 with an aggregate outlay of Rs 76,000 crore. The ATMP-OSAT sub-scheme (Modified Scheme for Semiconductor ATMP-OSAT Facilities) funds 50 percent of the capital expenditure for Assembly, Testing, Marking and Packaging by a design-owning company that packages and tests its own semiconductor dies, and for Outsourced Semiconductor Assembly and Test facilities operated by third-party OSAT providers that offer assembly, packaging and test services to multiple design-owning customers. Each anchor beneficiary's fiscal support is disbursed on a milestone-linked basis pegged to capital expenditure incurred at the sanctioned facility, package-type qualification proof and employment commitment achieved, against the disbursement schedule set out in the ISM approval letter.
  • India Semiconductor Mission (ISM), MeitY nodal agency and ATMP-OSAT approval letters — The India Semiconductor Mission is the nodal agency under MeitY for the Modified Scheme. The Union Cabinet approved the first ATMP anchor beneficiary — an anchor US memory-technology group's ATMP facility at Sanand Gujarat — in June 2023 with a project cost of approximately USD 2.75 billion (approximately Rs 22,900 crore) and a corresponding 50 percent fiscal-support ceiling of approximately USD 1.375 billion (approximately Rs 11,500 crore). Three further OSAT beneficiaries were approved in the February 2024 and September 2024 windows across Sanand Gujarat, Morigaon Assam and Mysuru Karnataka. Each ATMP-OSAT approval letter sets out the sanctioned project cost, the fiscal-support ceiling, the capex-linked milestone tranche schedule, the package-type qualification requirement, and the direct-employment commitment; the milestone-linked disbursement is administered by ISM via a portal reporting cycle with chartered engineer certification, statutory auditor cost certification, package-type qualification proof and employment affidavit against each tranche request.
  • Section 195 Income-tax Act 1961 (Income-tax Act 2025 successor provisions) and DTAA withholding on cross-border royalty and technology-transfer payments — Section 195 requires deduction of tax at source on any sum chargeable to tax in India that is payable to a non-resident. For an ATMP anchor beneficiary that is an Indian subsidiary of a foreign design-owning parent, intra-group flows for packaging technology transfer, process-know-how licence fee and royalty on the packaged product typically fall within the definition of royalty and fees for technical services under the Income-tax Act read together with the applicable Double Tax Avoidance Agreement. The withholding rate is the lower of the domestic-law rate for the payment category and the relevant Article rate of the DTAA between India and the parent's residence jurisdiction, subject to production of a valid Tax Residency Certificate and Form 10F, and to Permanent Establishment characterisation. Where the intra-group arrangement is characterised as one where the Indian ATMP entity purchases packaging services or wafer-supply from the overseas affiliate rather than making a royalty payment, the withholding characterisation may shift; the Section 92 transfer-pricing framework governs arm's-length pricing of the intra-group flow independent of the withholding characterisation.
  • Customs BCD, IGST via Bill of Entry on ICEGATE, and Section 194Q non-applicability to imports — Semiconductor wafers imported by an ATMP anchor beneficiary from a related-party overseas fab fall under HSN 3818.00 (chemical elements doped for use in electronics, in the form of discs, wafers) with the applicable Basic Customs Duty rate and Integrated Goods and Services Tax under Section 3(7) of the Customs Tariff Act 1975 collected at the port of import via the Bill of Entry on ICEGATE. The Bill of Entry is the primary evidence of landed cost, BCD paid and IGST paid; the IGST paid on import is credited to the electronic credit ledger of the importer's GSTIN and is available as input tax credit against outward GST liability. Section 194Q of the Income-tax Act, which imposes 0.1 percent TDS on the buyer for aggregate purchases from a single seller above Rs 50 lakh per FY, applies to domestic seller purchases and does not apply to imports where the seller is a non-resident with no permanent establishment in India — the applicable regime on the import leg is Section 195 read with the DTAA for any payment characterised as royalty or fees for technical services, and BCD plus IGST via Bill of Entry for the goods-import leg. Basic Customs Duty exemption or concessional rate for capital equipment imports by ISM-approved anchor beneficiaries is governed by the applicable Customs notification in force at the time of import, subject to end-use bond execution and periodic end-use certification.
  • Section 92BA and Rule 10D Income-tax Rules 1962 — transfer pricing documentation for related-party transactions — Section 92BA (specified domestic transactions) and Section 92C (arm's-length pricing) read with Rule 10D of the Income-tax Rules 1962 require an assessee to maintain contemporaneous transfer-pricing documentation for related-party transactions above the applicable threshold. For an ATMP anchor beneficiary that is an Indian subsidiary of a foreign design-owning parent, the intra-group wafer supply (parent-to-subsidiary movement of DRAM or NAND wafers for packaging), the intra-group packaging-technology royalty, the intra-group management-service-fee and cost-sharing arrangement, and the intra-group finished-module sales flow (subsidiary-to-parent movement of packaged DRAM or NAND modules for global distribution) all attract transfer-pricing scrutiny. The Section 92E audit report (Form 3CEB) is filed by the accountant, and the Rule 10D documentation set includes the ownership structure, functional analysis, industry analysis, comparable-uncontrolled-price or transactional-net-margin-method benchmarking, and the underlying agreements. Failure to maintain contemporaneous documentation or to file Form 3CEB within the due date attracts penalty under Section 271AA and Section 271BA respectively.
  • Ind AS 20 and Ind AS 38 — accounting for government grants and intangible asset capitalisation — Ind AS 20 (Accounting for Government Grants and Disclosure of Government Assistance) governs the recognition of the ISM Modified Scheme ATMP-OSAT sub-scheme fiscal-support tranche as a conditional grant related to assets. Recognition typically aligns with each ISM milestone certification event once the anchor beneficiary has reasonable assurance that the milestone bundle will be accepted and the tranche will be received. Presentation choice is between deferred income (amortised into profit and loss over the useful life of the related asset) and deduction from the carrying amount of the related asset (reducing depreciation over the useful life). Ind AS 38 (Intangible Assets) governs the capitalisation of intangibles such as the technology-transfer licence acquired from the foreign design-owning parent; where the technology-transfer licence is capitalised as an intangible asset with a defined useful life, amortisation aligns with the useful-life period and interacts with the Ind AS 20 recognition trajectory.

Frequently Asked Questions

What is the ATMP-OSAT sub-scheme under the India Semiconductor Mission Modified Scheme, and how does it differ from the semiconductor fab sub-scheme?
The Modified Scheme for Semiconductor ATMP-OSAT Facilities is one of the four sub-schemes of the Modified Scheme notified by MeitY in September 2022 within the Rs 76,000 crore aggregate outlay. It funds 50 percent of the capital expenditure of Assembly, Testing, Marking and Packaging facilities set up by a design-owning company that packages and tests its own semiconductor dies, and of Outsourced Semiconductor Assembly and Test facilities set up by third-party OSAT providers. The sub-scheme differs from the semiconductor fab sub-scheme in three material ways: capital intensity (an ATMP-OSAT project typically ranges from approximately USD 200 million to USD 2.75 billion in project cost, versus a fab project at Rs 40,000 to over Rs 90,000 crore), technology proof (the ATMP-OSAT beneficiary demonstrates package-type qualification with acceptable line yield certified by the customer design house for a design-owned ATMP or by the qualified process for a merchant OSAT, versus a fab beneficiary demonstrating process-node qualification with wafer yield per node), and equipment mix (wire bonders, die attach machines, mould presses, singulation dicers, test handlers, burn-in ovens and ATE testers for an ATMP-OSAT, versus steppers, ion implanters, chemical vapour deposition tools, plasma etchers and chemical mechanical planarisation tools for a fab). The disbursement mechanism is the same across both sub-schemes: capex-linked milestone tranche release against certified capital expenditure, technology qualification proof and employment commitment achievement per the ISM approval letter.
How does an anchor ATMP beneficiary that is an Indian subsidiary of a foreign design-owning parent reconcile the related-party wafer import register under customs, GST and income-tax rules?
An anchor ATMP beneficiary that is an Indian subsidiary of a foreign design-owning parent (for example, the anchor US memory-technology group's Sanand ATMP receiving DRAM and NAND wafers from the parent's US fabs) runs three parallel reconciliation surfaces on the related-party wafer import register. The first is the customs surface: each wafer shipment is imported under HSN 3818.00 (chemical elements doped for use in electronics, in the form of discs, wafers) with the applicable Basic Customs Duty rate and Integrated Goods and Services Tax under Section 3(7) of the Customs Tariff Act 1975 collected at the port of import via the Bill of Entry on ICEGATE. The Bill of Entry is the primary evidence of landed cost, BCD paid and IGST paid; the IGST paid on import is credited to the electronic credit ledger of the importer's GSTIN. The second is the income-tax surface: Section 194Q (0.1 percent buyer-side TDS above Rs 50 lakh per single seller per FY) does not apply to imports where the seller is a non-resident with no permanent establishment in India; the applicable regime is Section 195 read with the applicable Double Tax Avoidance Agreement between India and the parent's residence jurisdiction for any payment characterised as royalty or fees for technical services, and BCD plus IGST via Bill of Entry for the goods-import leg. The third is the transfer-pricing surface: the intra-group wafer supply is a related-party transaction attracting Section 92 arm's-length pricing scrutiny with Section 92E audit report (Form 3CEB) filed by the accountant and Rule 10D contemporaneous documentation maintained by the assessee, and the intra-group agreement between the Indian subsidiary and the foreign parent must set out the pricing basis, the value chain step covered, and the risk allocation.
How is the Section 195 TDS on the intra-group packaging-technology royalty from the Indian ATMP subsidiary to the foreign design-owning parent computed and reconciled?
The Section 195 TDS on the intra-group packaging-technology royalty from an Indian ATMP subsidiary to its foreign design-owning parent is computed by applying the lower of the domestic-law rate for royalty and the applicable Article rate of the Double Tax Avoidance Agreement between India and the parent's residence jurisdiction, subject to the parent producing a valid Tax Residency Certificate and Form 10F. For most India-outbound DTAAs, the royalty Article rate is materially lower than the domestic-law rate of 20 percent plus surcharge and cess. The reconciliation surface has four components: the intra-group royalty agreement setting out the technology-transfer scope, the royalty calculation base (typically a percentage of net sales or per-unit royalty), and the applicable jurisdiction; the monthly or quarterly royalty accrual against the packaging output; the Section 195 TDS deduction at the applicable rate on each accrual; and the annual Form 15CA-15CB filing with the accountant's certificate for each cross-border remittance. Failure to deduct the correct rate creates a disallowance under Section 40(a)(i) on the corresponding royalty expense and a potential penalty exposure. The transfer-pricing framework under Section 92 and Rule 10D independently governs whether the royalty rate itself is at arm's length, and the two questions (withholding rate versus arm's-length rate) are answered separately.
What is the illustrative multi-year capex-and-commissioning profile for an ATMP anchor beneficiary at the scale of the Sanand ATMP project, and when does the first milestone-linked fiscal-support tranche land?
An illustrative multi-year capex-and-commissioning profile for an ATMP anchor beneficiary at the scale of the Sanand ATMP project (project cost approximately USD 2.75 billion or approximately Rs 22,900 crore with a 50 percent fiscal-support ceiling of approximately Rs 11,500 crore) shows Year 1 (FY 2024-25) capex of approximately Rs 8,500 crore on land, facility build and initial procurement of wire bonders, flip-chip attach machines and test equipment; Year 2 (FY 2025-26) capex of approximately Rs 10,000 crore on the full ATMP line build-out and process qualification for the primary DRAM and NAND package types; and Year 3 (FY 2026-27) capex of approximately Rs 4,400 crore on additional package-type qualification and pilot production. Under this illustrative profile, the first milestone-linked fiscal-support tranche typically lands in FY 2027-28 once the ISM has certified the milestone bundle (capex incurred, package-type qualification proof and employment ramp against the direct-jobs commitment). Recognition under Ind AS 20 aligns with the ISM milestone certification event rather than the cash-receipt event, and the presentation choice (deferred income line versus deduction from asset carrying amount) is disclosed in the accounting policy note. The direct-employment commitment of approximately 5,000 direct jobs at full ramp — with indirect employment estimated at 15,000 to 20,000 across the ecosystem — is tracked on a per-milestone basis against the ISM approval letter's employment ramp schedule.
How does the reconciliation surface for an ATMP anchor beneficiary interact with the fab sub-scheme reconciliation surface for a group that has exposure to both sub-schemes across different legal entities?
A group with exposure to both the fab sub-scheme (via one legal-entity beneficiary running a silicon fab at qualified CMOS nodes) and the ATMP-OSAT sub-scheme (via a separate legal-entity beneficiary running an Assembly, Testing, Marking and Packaging or a merchant OSAT facility) runs each beneficiary's reconciliation independently against the respective ISM approval letter, because each approval letter is a bilateral instrument between the specific legal entity and the ISM with its own sanctioned project cost, fiscal-support ceiling, milestone tranche schedule, technology-qualification requirement and employment commitment. Where the two beneficiaries are related parties within the group, the intra-group flows (die transfer from the group fab to the group ATMP for packaging, intra-group technology-licence-fee, intra-group management-service-fee) attract Section 92BA specified-domestic-transaction treatment with Rule 10D documentation and Section 92E audit report (Form 3CEB) coverage. The consolidated group ERP ledger must isolate each beneficiary's capex, revenue and employment stream by legal entity and by sanctioned facility, and the ISM portal milestone reporting for each beneficiary must be traceable to the corresponding subset of the group ledger. The composite persona walkthrough at the sub-cluster covers this multi-beneficiary, multi-sub-scheme reconciliation grammar.