Skip to main content
Interactive calculator · Electronics · DVA scheme-agnostic BOM · Vendor-DVA aggregation

DVA (Domestic Value Addition) Calculator for PLI Electronics

End-to-end workbook for the Domestic Value Addition computation across every PLI Electronics scheme — PLI LSEM (Rs 40,995 crore, MeitY), PLI IT Hardware (Rs 17,000 crore revised, MeitY), PLI White Goods (Rs 6,238 crore, DPIIT), PLI Solar PV Modules (Rs 24,000 crore, MNRE), PLI ACC Battery (Rs 18,000 crore, DHI), and PLI Semiconductor Mission (Rs 76,000 crore, MeitY). Enter the scheme, the year in the incentive window, the landed cost of imported inputs (BoE ICEGATE), the domestic input value with vendor GST invoice, the vendor-DVA weighted-average percentage, the certificate-coverage share (with 50 percent haircut on the uncertified portion), the direct labour, factory overhead and profit margin. The tool computes the DVA numerator (value added domestically) and denominator (ex-factory value), the DVA percentage, the scheme-specific year-target comparison, the deficit alert, the vendor-DVA certification coverage flag, and a recommended remediation. Live-recompute on input change.

Illustrative — actual DVA computation depends on the authenticity and currency of every vendor-DVA certificate in the supply base, the accuracy of the ICEGATE Bill of Entry landed-cost trail (CIF plus Basic Customs Duty plus AIDC plus IGST-paid-at-import), the ex-factory value computation under Section 15 CGST Act 2017, and the statutory-auditor Form 3CD-style certification per the scheme's admissibility rules (MeitY for LSEM / IT Hardware / Semiconductor, DPIIT for White Goods, MNRE for Solar PV Modules, DHI for ACC Battery). Scheme-specific DVA target trajectories are indicative and evolve — verify your applicant-specific DVA target letter, the scheme notification amendments, the direct-vendor certificate authenticity and the Tier-2 / Tier-3 sub-vendor aggregation with your PLI application coordinator, your statutory auditor and your Company Secretary before finalising any annual PLI claim submission on the scheme portal. The tool does not constitute tax, subsidy-scheme or legal advice.

50 percent haircut on uncertified vendors — every PLI Electronics scheme applies a 50 percent haircut on the invoice value of any direct vendor that has not furnished a valid current vendor-DVA certificate to the applicant. This is the single most common reason enterprise applicants miss the annual DVA target — the raw domestic input value looks adequate on paper, but the haircut pulls the DVA percentage below the scheme trajectory. Prioritise vendor onboarding by input-value contribution, not by vendor count.

DVA input file — single-year snapshot
1. PLI scheme + year in incentive window
2. Imported input landed cost (Rs cr, BCD-inclusive)
3. Domestic input + vendor-DVA aggregation (Rs cr and %)
4. Direct labour + factory overhead + profit margin (Rs cr)
DVA percentage — computed
0.0% vs target 0.0%
DVA formula breakdown (Rs cr)
Domestic input (certified portion, face value) ₹ 0
Domestic input (uncertified portion, 50% haircut) ₹ 0
Domestic input value creditable (after haircut) ₹ 0
Direct labour + overhead + profit (100% domestic) ₹ 0
Numerator — value added domestically ₹ 0
Imported input landed cost (from ICEGATE BoE) ₹ 0
Denominator — ex-factory value ₹ 0
Vendor-DVA certification coverage
Certified vendor coverage 0.0%
Uncertified vendor coverage (haircut applies) 0.0%
Value lost to haircut (Rs cr) ₹ 0

Illustrative DVA target trajectory by PLI scheme

Indicative year-on-year DVA target ramps across the major PLI Electronics schemes. Applicant-specific target letters can differ from these indicative trajectories — always cross-check against your specific approval letter and the latest scheme notification amendments. Semiconductor / ATMP-OSAT DVA is milestone-based and depends on the sub-scheme (fab / display / compound / ATMP) and the applicant's capacity ramp plan.

Scheme Y1 Y2 Y3 Y4 Y5 Y6
LSEM Mobile Handset (premium segment) 20% 30% 35% 45% 55%
LSEM Electronic Component 20% 25% 30% 35% 45%
IT Hardware — Laptop / Tablet / AiO 20% 25% 30% 35% 40% 45%
IT Hardware — Server / USFF 15% 20% 25% 30% 35% 40%
White Goods — AC Component 25% 30% 35% 40% 45%
White Goods — LED 25% 30% 35% 40% 45%
Solar PV Module (module-only) 30% 35% 40%
ACC Battery Storage 25% 30% 40% 50% 60%
Semiconductor / ATMP-OSAT Milestone-based — sub-scheme (fab / display / compound / ATMP) and capacity-ramp specific

DVA computation reference — formula components

Component Formula / Definition Regulatory anchor
Ex-factory value (denominator) Imported input landed + Domestic input + Direct labour + Overhead + Profit margin Section 15 CGST Act 2017 transaction value at factory gate, before dispatch and packaging-and-forwarding.
Imported input landed cost CIF + BCD + AIDC + IGST-paid-at-import (per Bill of Entry) Customs Valuation Rules 2007 assessable value; ICEGATE BoE trail; Customs Tariff Act 1975.
Domestic input value (certified) Vendor GST invoice value × vendor-DVA % (from valid vendor-DVA certificate) Scheme guideline vendor-DVA certification protocol. GST invoice per Section 31 CGST Act 2017.
Domestic input value (uncertified — 50% haircut) Vendor GST invoice value × 50% (presumed indirect-import share) Scheme guideline default haircut for vendors without a valid current vendor-DVA certificate.
Direct labour Wages + PF + gratuity + statutory contributions (100% domestic) Payment of Wages Act 1936; EPF Act 1952; Payment of Gratuity Act 1972.
Factory overhead Utility + rent + depreciation + insurance + plant maintenance (100% domestic) Ind AS 2 (Inventories) cost of conversion; Companies Act 2013 Schedule II depreciation.
Profit margin Ex-factory value − (Imported + Domestic + Labour + Overhead) Residual after material and conversion cost; 100% domestic.
Numerator — value added domestically Domestic input creditable (post-haircut) + Direct labour + Overhead + Profit margin Scheme-agnostic BOM walk-down under PLI Electronics DVA guideline.
DVA percentage Numerator ÷ Denominator × 100 PLI scheme-specific admissibility rule; annual statutory-auditor certification.
Job-work component (Section 143) Free-issue movement to job-worker; return-of-input within 1 year (3 years capital goods) Section 143 CGST Act 2017; Rule 45 challan; ITC-04 quarterly return.
Statutory-auditor certification Form 3CD-style, MeitY / DPIIT / DHI / MNRE-prescribed, product-code-level (HSN) PLI scheme guideline; ICAI Guidance Note on Reports and Certificates for Special Purposes.

DVA is measured on a product-code-level (HSN) basis and aggregated at approved-product-basket level. The direct-vendor certificate governs the Tier-1 DVA input; the direct vendor is responsible for aggregating its own Tier-2 and Tier-3 sub-vendor DVA into the certificate that flows through to the applicant. Scheme portal claim submission for LSEM uses the MeitY PLI portal; for IT Hardware the same MeitY portal; for White Goods the DPIIT portal; for Solar PV Modules the IREDA / SECI portal per Tranche; for ACC Battery the DHI portal; for Semiconductor / ATMP-OSAT the ISM portal.

About DVA in PLI Electronics — the scheme-agnostic BOM walk-down and the vendor-DVA aggregation problem

Domestic Value Addition is the single most consequential metric in every PLI Electronics scheme — it is the metric on which the incentive stands or falls year by year across the 5-year or 6-year window. The Rs 1.97 lakh crore aggregate PLI outlay across 13 sectors administered by seven ministries includes six electronics-adjacent schemes that each rely on the DVA computation as the admissibility gate: PLI LSEM (Rs 40,995 crore, MeitY notification 01-April-2020, base FY 2019-20, 5-year window FY 2020-21 to FY 2024-25); PLI IT Hardware revised (Rs 17,000 crore, MeitY notification May 2023, base FY 2022-23, 6-year window, covering laptop / tablet / all-in-one PC / server / ultra-small-form-factor sub-segments); PLI White Goods (Rs 6,238 crore, DPIIT notification 16-April-2021 following Cabinet approval 07-April-2021, FY 2021-22 to FY 2028-29 7-year window, covering AC components and LED); PLI Solar PV Modules (Rs 24,000 crore, MNRE administered, Tranche I of Rs 4,500 crore implemented by IREDA plus Tranche II of Rs 19,500 crore implemented by SECI); PLI ACC Battery Storage (Rs 18,000 crore, DHI-administered Advanced Chemistry Cell scheme with GWh capacity commitment and technology-agnostic LFP / NMC / other-chemistry structure); and PLI Semiconductor / ISM (Rs 76,000 crore, MeitY, Modified Scheme, four sub-schemes covering fab / display fab / compound semiconductor / ATMP-OSAT).

The scheme-agnostic BOM walk-down is straightforward on paper. Start with the ex-factory value of the eligible product basket (Section 15 CGST Act 2017 transaction value at factory gate, before dispatch, before packaging-and-forwarding). Subtract the landed cost of imported inputs (Customs assessable value per the Bill of Entry lodged on the ICEGATE portal, being CIF plus Basic Customs Duty plus AIDC plus IGST paid at import per the Customs Valuation Rules 2007). The residual is the value added domestically. That residual decomposes into five components. Domestic input value with valid vendor GST invoice from the Tier-1 supply base — and here the vendor-DVA aggregation problem enters. Direct labour cost, being wages plus PF plus gratuity plus statutory contributions (100 percent domestic under the Payment of Wages Act 1936, EPF Act 1952 and Payment of Gratuity Act 1972). Factory overhead being utility plus rent plus depreciation plus insurance plus plant maintenance (100 percent domestic, computed per Ind AS 2 cost-of-conversion framework and Companies Act 2013 Schedule II depreciation). Profit margin, being the ex-factory-value residual after material and conversion cost (100 percent domestic). And any residual movement of components under Section 143 CGST Act 2017 free-issue job-work challan movement (Rule 45 challan plus ITC-04 quarterly return, 1-year return-of-input window for inputs and 3-year window for capital goods).

The vendor-DVA aggregation problem is the operational bite. Every PLI Electronics scheme allows domestic input value to count toward DVA at face value only if the direct Tier-1 vendor has itself furnished a vendor-DVA certificate attesting to what portion of that vendor's supply is genuinely domestic value addition versus what portion is a pass-through of imported inputs (an indirect import). Without such a certificate, the scheme applies a 50 percent haircut — the applicant may count only 50 percent of the uncertified vendor's invoice value as domestic input, with the other 50 percent presumed to be indirect imports. In practice, a Tier-1 EMS participant in a mobile handset supply chain (Foxconn Bharat FIH, Dixon Technologies via Padget Electronics for Samsung India and Xiaomi India contract manufacturing, Bharat FIH, Micromax's In Mobile India entity) buys sub-assemblies (PCBA, wire harness, plastic moulding, sheet-metal fabrication, packaging, connectors, passive components) from a mixed vendor base — some vendors are large listed enterprises (Amber Enterprises leading AC components, Syrma SGS Technology on PCBA and memory sub-assemblies, Kaynes Technology on industrial and EMS, Elin Electronics, PG Electroplast on washing-machine sub-systems, Optiemus Electronics, Havells on LED and appliances) with in-house DVA certification programs, and others are MSME vendors who have not yet operationalised vendor-DVA certification. The uncertified-vendor coverage gap is the single most common reason enterprise applicants miss the annual DVA target — the raw domestic input value looks adequate on paper, but the 50 percent haircut on the uncertified portion pulls the DVA percentage below the scheme trajectory.

Scheme-specific DVA target trajectories are indicative and evolve with scheme amendments. PLI LSEM Mobile Handsets ramps from approximately 20 percent Year 1 to approximately 40 to 60 percent by Year 5 depending on segment (above-Rs-15,000-per-unit premium versus Rs-10,000-to-Rs-15,000-per-unit domestic segment). PLI LSEM Electronic Components ramps from approximately 20 percent Year 1 to approximately 40 to 50 percent by Year 5. PLI IT Hardware ramps from approximately 15 to 20 percent Year 1 to approximately 40 to 45 percent by Year 6. PLI White Goods ramps from approximately 25 percent Year 1 to approximately 45 percent by Year 5 for both the AC-component sub-segment and the LED sub-segment. PLI Solar PV Modules enforces a milestone-based DVA target tied to backward integration into cell, wafer and polysilicon manufacture (Waaree Energies, Adani Solar Mundra, Reliance New Energy Solar, Tata Power Solar and Vikram Solar Panvel are the cornerstone Tranche participants). PLI ACC Battery ramps most aggressively — approximately 25 percent Year 1 rising to approximately 60 percent by Year 5, reflecting the strategic imperative to indigenise the battery supply chain end-to-end for the Reliance New Energy Jamnagar giga, Ola Electric Cell Technology Krishnagiri and Rajesh Exports JV cornerstone participants. PLI Semiconductor / ISM uses a milestone-based DVA test tied to fab construction, capacity ramp and technology-node validation for Tata Electronics Sanand (JV with PSMC), Micron India Sanand ATMP, Kaynes Semicon OSAT and CG Power Sanand (JV with Renesas). Applicant-specific target letters can differ from the published indicative trajectory — always cross-check.

The annual PLI Electronics claim cycle culminates in a statutory-auditor certification in a MeitY / DPIIT / DHI / MNRE-prescribed Form 3CD-style format. The certificate covers the ex-factory value under Section 15 CGST Act 2017, the landed cost of imported inputs from the ICEGATE Bill of Entry trail, the vendor-DVA aggregation with the direct-vendor certificate register, the direct labour cost from the payroll register, the factory overhead from the general ledger, the profit margin as the ex-factory value residual, and the resulting DVA percentage at the product-code-level (HSN) aggregated to the approved-product-basket level. The certification framework relies on the ICAI Guidance Note on Reports and Certificates for Special Purposes and the auditor's own reasonable-assurance obligations under the Companies Act 2013 audit framework. The scheme portal claim submission is annual for LSEM and White Goods, quarterly-plus-annual for IT Hardware and ACC Battery, and milestone-plus-annual for Semiconductor / ISM. The evidence trail spans the GSTR-1 outward-supply feed, the GSTR-2A / 2B inward-supply reconciliation, the ICEGATE BoE reconciliation, the vendor-DVA certificate register (with expiry-date tracking), the Section 143 job-work challan trail (Rule 45 plus ITC-04 return), the payroll register, the general ledger, and the applicant's ex-factory-value schedule.

TransactIG operationalises the DVA reconciliation at production scale — the GSTR-1 outward-supply feed against the SAP FI CO invoice-level roll-up against the ex-factory-value schedule against the ICEGATE Bill of Entry landed-cost trail against the vendor-DVA certificate register (with expiry-date and certificate-authenticity monitoring) against the Section 143 job-work challan and ITC-04 quarterly return against the payroll register against the general ledger against the statutory-auditor Form 3CD-style certification workbook against the scheme portal annual claim submission. Product-code by product-code, invoice by invoice, vendor by vendor, quarter by quarter. ISO 27001:2022, AWS Mumbai, implementation two to four weeks.

Related

Insight — Wave 1 cornerstone

DVA (Domestic Value Addition) computation for PLI Electronics

The scheme-agnostic BOM walk-down: ex-factory value, ICEGATE landed cost, vendor-DVA aggregation with 50 percent haircut for uncertified vendors, and the annual statutory-auditor Form 3CD-style certification.

Insight — Wave 1 sibling

PLI scheme selector for electronics manufacturing (India)

Choosing among LSEM Mobile Handset, LSEM Electronic Component, IT Hardware, White Goods, Solar PV Module, ACC Battery and Semiconductor / ISM — segment fit, DVA target, incentive rate and admissibility rules compared.

Tool — Wave 1 sibling

PLI Electronics scheme selector

Match your product line against the six electronics-adjacent PLI schemes; see incentive rate schedule, DVA target trajectory and minimum investment commitment side-by-side.

Cluster hub

Electronics manufacturing reconciliation cluster

The full electronics manufacturing reconciliation library — PLI stack navigation, DVA computation, LSEM mobile handset and electronic component claim, IT Hardware, ACC Battery, Semiconductor / ISM.

Tool — cross-cluster

PLI Pharma Eligibility + Quarterly Claim Tracker

The Pharma equivalent — Rs 15,000 crore PLI Pharma scheme, Category 1 / 2 / 3 rate schedule, DVA test for Category 2 KSMs, DoP portal quarterly claim tracker and Ind AS 20 recognition worksheet.

Money page

Reconciliation software — India

Overview of TransactIG's reconciliation surface — PLI DVA, GSTR-1 to SAP FI CO invoice roll-up, ICEGATE BoE reconciliation, vendor-DVA certificate register and statutory-auditor certification workbook.

Frequently Asked Questions

What is DVA (Domestic Value Addition) and why does every PLI Electronics scheme measure it? +

Domestic Value Addition is the percentage share of an eligible electronics product's ex-factory value that is attributable to Indian-origin materials, labour, overhead and profit — that is, the share that is NOT attributable to imported inputs. The scheme-agnostic formula treats the ex-factory value (the sale value of the eligible product at the factory gate under the Section 15 CGST Act 2017 transaction-value framework) as the denominator, and the ex-factory value minus the landed cost of imported inputs (Customs assessable value, being CIF plus Basic Customs Duty plus AIDC plus IGST-paid-at-import per the Bill of Entry lodged on the ICEGATE portal) as the numerator. Every PLI Electronics scheme — PLI LSEM (Large-Scale Electronics Manufacturing, Rs 40,995 crore, MeitY notification 01-April-2020), PLI IT Hardware (Rs 17,000 crore revised scheme, MeitY notification May 2023), PLI White Goods (Rs 6,238 crore, DPIIT notification April 2021), PLI Solar PV Modules (Rs 24,000 crore, MNRE), PLI ACC Battery Storage (Rs 18,000 crore, DHI), and PLI Semiconductor Mission (Rs 76,000 crore, MeitY) — measures DVA year-on-year against a scheme-specific target trajectory that ramps up across the 5-year or 6-year incentive window. Failing to meet the DVA target in a given year either blocks the incentive claim for that year or triggers a pro-rata reduction, depending on the scheme's specific admissibility rules. Verification happens at year-end via a statutory-auditor certification in a MeitY / DPIIT / DHI / MNRE-prescribed Form 3CD-style format, cross-referenced with the ICEGATE Bill of Entry trail and the vendor GST invoice register.

How is DVA computed across the scheme-agnostic BOM for a PLI Electronics applicant? +

The scheme-agnostic DVA computation walks the Bill of Materials from ex-factory value down through the input mix. Start with the ex-factory sale value of the eligible product basket (Section 15 CGST transaction value at factory gate, before dispatch, before packaging-and-forwarding). Subtract the landed cost of imported inputs (Customs assessable value per the Bill of Entry on ICEGATE). The residual is the value added domestically. That residual decomposes into five components: (1) Domestic input value with valid vendor GST invoice and either a vendor-DVA certificate or the 50 percent haircut (indirect-import assumption), (2) Direct labour cost (wages plus PF plus gratuity plus statutory contributions, per Section 143 CGST wage cost accounting), (3) Factory overhead (utility plus rent plus depreciation plus insurance plus plant maintenance), (4) Profit margin (the ex-factory-value residual after material and conversion cost), and (5) any residual movement of components under Section 143 job-work challan movement (Rule 45 challan plus ITC-04 quarterly return). The DVA percentage equals the value-added-domestically figure divided by the ex-factory value, multiplied by 100. This tool live-recomputes on every input change and produces the numerator, denominator and DVA percentage alongside the scheme-specific year-target comparison and the deficit alert if the DVA is below the target trajectory for the selected scheme and year. Statutory-auditor certification of the DVA figure is mandatory before the annual PLI claim submission on the scheme portal.

What does the 50 percent haircut for uncertified vendors mean and when is it applied? +

Every PLI Electronics scheme allows domestic input value to count toward DVA at face value only if the direct vendor has itself furnished a vendor-DVA certificate attesting to what portion of that vendor's supply is genuinely domestic value addition versus what portion is a pass-through of imported inputs (an indirect import). Without such a certificate, the scheme applies a 50 percent haircut — the applicant may count only 50 percent of the uncertified vendor's invoice value as domestic input, with the other 50 percent presumed to be indirect imports. In practice, a Tier-1 EMS (Electronics Manufacturing Services) participant like Dixon Technologies, Foxconn Bharat FIH, Amber Enterprises, Syrma SGS Technology, Elin Electronics, Kaynes Technology, PG Electroplast or Optiemus Electronics buys sub-assemblies (PCBA, wire harness, plastic moulding, sheet-metal fabrication, packaging) from a mixed vendor base — some vendors are large listed enterprises with in-house DVA certification programs, others are MSME vendors who have not yet operationalised vendor-DVA certification. This tool separately asks for the percentage of your domestic input value that is covered by a valid current vendor-DVA certificate, applies face-value crediting to the certified portion, and applies the 50 percent haircut to the uncertified portion. The output flags the uncertified-vendor coverage gap as a red alert because that gap is the single most common reason PLI Electronics applicants miss the annual DVA target — the raw domestic input value looks adequate on paper, but the haircut on the uncertified portion pulls the DVA percentage below the scheme target. The remediation is a vendor-onboarding acceleration program that walks Tier-2 and Tier-3 vendors through the vendor-DVA certification protocol.

What DVA target applies to my PLI scheme and how does it ramp up year-on-year? +

Each PLI Electronics scheme publishes its own DVA target trajectory in the scheme notification and applicant approval letter. The illustrative reference lookup embedded in this tool covers the scheme families most commonly encountered by Indian electronics manufacturers. PLI LSEM Mobile Handsets (both the above-Rs-15,000-per-unit premium segment and the Rs-10,000-to-Rs-15,000-per-unit domestic segment) ramps the DVA target from approximately 20 percent in Year 1 to approximately 40 to 60 percent by Year 5, depending on segment. PLI LSEM Electronic Components (specified electronic sub-assemblies) ramps from approximately 20 percent Year 1 to approximately 40 to 50 percent by Year 5. PLI IT Hardware (revised scheme with laptop, tablet, all-in-one PC, server, ultra-small-form-factor sub-segments) ramps from approximately 15 to 20 percent Year 1 to approximately 40 to 45 percent by Year 6. PLI White Goods (AC components and LED) ramps from approximately 25 percent Year 1 to approximately 45 percent by Year 5. PLI Solar PV Modules (Tranche I under IREDA plus Tranche II under SECI) enforces a milestone-based DVA target tied to backward integration into cell, wafer and polysilicon manufacture (approximately 30 percent Year 1 rising to approximately 40 percent Year 3 for module-only participants). PLI ACC Battery ramps from approximately 25 percent Year 1 to approximately 60 percent by Year 5 (India's most aggressive DVA trajectory, reflecting the strategic imperative to indigenise the battery supply chain end-to-end). PLI Semiconductor / ISM uses a milestone-based DVA test tied to fab, display fab, compound, ATMP-OSAT sub-scheme construction and capacity ramp. Always confirm the exact DVA target trajectory in your specific approval letter with your PLI application coordinator — scheme guidelines evolve and the applicant-specific target can differ from the published indicative trajectory.

How is vendor-DVA aggregated in a multi-tier vendor tree, and what happens when a Tier-2 sub-vendor is not certified? +

Vendor-DVA aggregation in a multi-tier vendor tree follows a direct-vendor-only rule under most PLI Electronics scheme guidelines — the PLI applicant computes DVA based on the direct (Tier-1) vendor's DVA certificate, and the direct vendor is in turn responsible for aggregating its own Tier-2 and Tier-3 sub-vendor inputs into the certificate that it furnishes to the applicant. In practice this means that if a mobile handset assembler like Foxconn Bharat FIH or Dixon (via Padget Electronics for Samsung India and Xiaomi India contract manufacturing) buys a PCBA sub-assembly from a Tier-1 EMS vendor, that Tier-1 EMS vendor's DVA certificate must consolidate all its own imported-component purchases (memory chips, RF front-end, application processors, connectors, passive components) into the Value-of-Imported-Inputs line before certifying the DVA percentage that flows through to the mobile handset assembler. If a Tier-2 sub-vendor to the Tier-1 EMS is itself uncertified, that Tier-2 uncertified input attracts the 50 percent haircut at the Tier-1 level, which reduces the Tier-1 DVA certificate percentage, which in turn reduces the applicant's overall DVA. The cascade effect is why enterprise applicants like Amber Enterprises (AC components), Syrma SGS Technology (PCBA and memory sub-assemblies), Havells (LED and appliances), Kaynes Technology (industrial plus EMS) and Bharat FIH have all operationalised structured vendor-DVA onboarding programs across their supply base, well before the annual PLI claim window. This tool models the aggregation at the direct-vendor level (asking for a weighted-average vendor-DVA percentage and a certificate-coverage percentage) so the applicant's finance team can quickly see the DVA outcome of a partial-certification base and prioritise vendor onboarding by input-value contribution.

From vendor-DVA scramble to production PLI Electronics annual close

TransactIG reconciles the GSTR-1 outward-supply feed against the SAP FI CO invoice roll-up against the ex-factory-value schedule against the ICEGATE Bill of Entry landed-cost trail against the vendor-DVA certificate register against the Section 143 job-work challan and ITC-04 return against the statutory-auditor Form 3CD-style certification workbook against the scheme portal annual claim submission. Product-code by product-code, invoice by invoice, vendor by vendor. ISO 27001:2022, AWS Mumbai, implementation two to four weeks.

Request a Demo Electronics Manufacturing Cluster →